Tommy Dobczyk walks through slope building, where homes are excavated into hillsides to create walkout basements and multi-story facades. A spec build on sloped land only works when the projected home value exceeds roughly $4 million, given land costs of $3.5 to $5 million.
Chapters
Everybody's building along the side here. So really need to do is verify and check to make sure that we could even build on the mountain. There might be a restriction of building on the side of the mountain, but we would have— we would come in this road right here and we'd build up inside the mountain. And I would, I would, I would have a mountainside construction. It's called the king of the castle. Well, it's called, uh, it's called slope building. And so we slope build a lot. Up in the Midwest because you have hills everywhere up in the Midwest. Right. And in order to build in the slope, you just go to the slope, you excavate out what you want, put the house in and build from there. That's how we end up with walkout basement. And so we can have a 2-story in the front, a 4-story in the back. And people are like, oh my God, you know, when you go around back, you're on the back of a slope. I've got not only a walkout basement, but then there's another one that's underneath that. So. That's why I get excited about looking at those types of things. So looking at it land-wise, we're, we're at 3.5 to 5. So the verdict is spec build only works if the value is clearly above $4 million and the buyer, or you buy the land, uh, lower, right?