Land Stewardship in the Solar Industry | Rhett Kerby, KerTec | #67

4 Jan 2022 · 30 min
Episode

4 Jan 2022 · 30 min

0:00

Podcast interview (Clean Power Hour #67) with Rhett Kerby (founder, Kertech) about land stewardship and environmental reclamation for large-scale solar projects. Key themes: preserving and restoring topsoil during construction (harvest/stockpile and re-spread), erosion control as primary stewardship goal, compaction limits for vegetation (200 psi begins to reduce root growth; 300 psi prevents root penetration), use of native plants and pollinator-friendly mixes to lower long-term O&M (estimated 40–60% O&M savings over a 25-year project when establishment is properly funded), and the common three-year establishment window with herbicide-assisted weed control. Practical advice covers cut-and-fill handling, penetrometer/ASTM compaction testing, regional stabilization strategies tied to evaporation-to-precipitation ratios (example: Texas west ~150 in evap vs 10 in rain; I-35 roughly marks ~1:1 evap:precip threshold), and mechanical vs vegetation-based erosion control depending on climate.

Questions this episode answers

~200 psi: root establishment begins to decrease; ~300 psi at the root zone: roots cannot penetrate.

About three growing seasons (three years) to achieve a satisfactory stand, often with herbicide-assisted weed control.

Around 2014 (Kerby's 'brainchild' with his brothers to apply plant/soil science in construction).

A 1.6 gigawatt power plant being developed in Indiana described as a 13,000-acre solar farm.

Over 10 gigawatts shipped in the U.S.; string inverters range from 25 kW to 350 kW; CPS 350 kW inverter designed to work with solar plants from 2 MW to 2 GW.