In this solo walkthrough, Joe Homs tours a four‑bedroom, two‑bathroom house he is flipping in Carson, California. He details the renovation work completed in the past three weeks, including new flooring, window replacements, installed can lights, ceiling texture, fireplace demolition and planned stacked‑stone refacing, kitchen and dining area updates, patio‑cover replacement, fence repairs, and ongoing tile work by contractor Angel. He outlines the home’s layout (two bedrooms downstairs, two upstairs, plus a master suite) and notes that baseboards, caulking, and painting preparations are underway. Joe estimates another 1.5–2 months to finish, expresses satisfaction with the progress, and ends with a call to subscribe and a link to a recently completed flip.
Chapters
Welcome. In today's video, we're going to talk about one of the flips that we're doing. We're in Carson, California. We picked up this flip, I'd say about 3 weeks ago. Contractors have been in, they're starting their work. Come on in, I'll show you what's going on. So at this point we've got the flooring down, we replaced all the windows as well, we installed can lights in the living room here. Drywall guy came by and did most of the work and he put new texture on the ceiling. That fireplace is going to be taken down, the front-facing bricks, And then we're going to replace it with stacked stone over there. If you move this way, we got the kitchen. Large kitchen, open concept, kind of moving out into the dining room area. Again, new windows, can lights in, large slider here, and in the backyard We replaced the patio cover that was basically rotted out, so they put some new pieces of wood out there. And then if you can see all the way in the corner, that fence was like that when we bought it, and the owner decided he was going to fix it. He bought all the bricks and the blocks but never did anything, so they're here ready to go. So that'll be one of the projects that the contractor gets to. This is 2 bed— I'm sorry, this is 4 bedrooms. 2 bedrooms downstairs, 2 bedrooms upstairs. Got 1 bedroom here. And then we've got a bathroom here, bathtub. That's what the tile guy is working on today. And then another bedroom down here. And you see that they finished the baseboards in here. The painters are here caulking everything, getting everything ready to paint. And we'll hop on upstairs. We got a bedroom here, and then we've got the master bedroom here. And again, as you see, all the flooring's done, windows are done, baseboards are done. And then, uh, we've got Angel, who is our number one tile contractor, uh, working in there. You can take a look in, uh, in there. Awesome. So anyways, that's, that's what we got going on here. Uh, probably be here, I'd say, another month and a half to 2 months. to completion, but I'm very happy with the progress that they've done in the last 3 weeks. You can see Angel should be done probably in a few days or so with that tile work, and then he'll start working on the floor there in the master bath. But I'm, I'm very happy with the progress that's been done here. Hey, thanks for joining me on this walkthrough today. I appreciate you coming to the channel. Don't forget to subscribe. If you need anything, please let me know. I'm here to answer your questions. If you want to take a look at the newest completed flip that we have, click on this link right here and that'll take you directly there.