Drew 2: Final Inspection time! But what if the house isn't 100% complete?

In this vlog, Drew walks through the final inspection of a property he has been renovating. He confirms that carpet has been installed, all lights are functional, doors operate correctly, and bathroom fixtures (sinks and toilets) are draining and flushing as a home inspector would check. During the walkthrough he spots two minor deficiencies: missing transition pieces between the hardwood flooring and the kitchen, and a missing door knob. To ensure these items are completed before the house is listed or rented, he decides to withhold $500‑$1,000 from the rehab crew until the crew installs the transition pieces and the knob. He explains this financial holdback as a quality‑control measure and promises to update viewers on the property's status.










