Rhett Kerby walks through reclamation work on a Texas panhandle wind farm. Roads need 20-25 feet of restoration on each side, and each turbine site requires 2-3 acres. The crew uses a 14-foot Truax no-till grass drill to seed the 120-acre project.
Questions this video answers
Roughly 20–25 ft on each side of the road.
About 2–3 acres under each turbine.
A 14-foot Truax no-till grass drill.
Four.
About 120 acres.