Two builders walk their nearly one-acre lot after the final slab pour, which kicks off vertical construction within days. The underground pipes and utilities took four weeks to install, a phase most people never see or think about.
Chapters
We have one more pour before we pour the big slab, and that's kind of like in my mind, it's like a start of a project because usually from the time we pour the slab, we can start going vertical in the next couple days after that. So the vertical part is really the really exciting part for like me, and that's when you start to see a house, and we're not too Catherine and I are both visiting the lot, and we see the stakes out there.
It's a big piece of land. This is almost an acre of land. And it's so fascinating, right, that they are laying out all of these pipes, all of this stuff that no one ever thinks about. The fact that that's a 4-week process is amazing.