Guidewheel and Pretium Packaging - Maximizing Runtime and Productivity

2 Feb 2022 · 1 min
1:00

Jorge Chao, plant manager at Pretium Packaging since 2019, installed Guidewheel in a week and watched runtime jump from the low 60s to the low 80s. The system gave him data to find inefficiencies and changed how he manages the plant.

Questions this video answers

Completed within a week.

2019.

In the low 60s (percent).

In the low 80s (percent).

Chapters

More from Lauren

youtu.be

Episode 6: Juan Carlos Alonso

11mo ago
youtu.be

Episode 8: David Ariens

11mo ago
youtu.be

Episode 7: Don Wiseman

11mo ago
youtube.com

Episode 9: Jeff McNabb

11mo ago
youtube.com

The Future Isn’t Just Coded — It’s Built | Lauren Dunford | TED

1y ago
youtube.com

From the Fabricator- S5E7- James Hatch (Kovach) Lauren Dunford (Guidewheel)

1y ago
youtube.com

FactoryOps in Action: Making AI (actually) work on the factory floor

1y ago
youtube.com

Intro to FactoryOps: Real-time visibility for smarter operations

1y ago
youtube.com

From Davos to the Factory Floor: Lauren Dunford’s Guidewheel Journey | Culture Talks

1y ago
youtube.com

Lauren Dunford of Guidewheel on Data-Driven Efficiency, Sustainable Factories, and Finding Champions

2y ago
youtube.com

Introducing Guidewheel AI-Powered FactoryOps

2y ago
See all content